Peak season is coming. Get your fulfillment and holiday returns plan in place →Plan your peak season →
OC3PL fulfillment center in Anaheim, California

How Much Inventory to Order for a First Production Run

Too little and you sell out of mediums on day one. Too much and cash sits on a shelf. A practical way to decide.

The Question Every New Brand Asks

There is no perfect number for a first run. You are guessing demand you have not seen yet. The goal is a quantity you can sell through, in a size mix that matches your customers, without tying up cash you need for the next run.

    What decides the number:

  • Factory minimums

    Most factories set a minimum per style or per color.
  • Your audience

    Email list, followers, preorders and past sales are your best evidence.
  • Size mix

    How many of each size, not just how many in total.
  • Cash

    What you can spend now and still afford a reorder.
  • Lead time

    How long a reorder takes if you sell out.

A Simple Way to Estimate

Start from evidence, then adjust for risk.

Before you commit, gather whatever signal you have. A small brand rarely has sales history, but it usually has something.

  • Preorders or a waitlist for the first drop.
  • Email subscribers and how many opened your last message.
  • Sales from a previous pop-up, sample sale or small batch.
  • Engagement on the posts that showed the product.

Then decide how much risk you can carry. Many first-time brands choose a smaller run with a plan to reorder, because selling out and restocking is a better problem than paying for storage on stock that does not move. A preorder can also tell you demand before you order.

Fewer styles, deeper sizes

A common first-run mistake is too many styles in too few units each. Every style comes in several sizes, so ten styles can mean fifty or more SKUs with only a handful of units in each. Fewer styles with a full size run usually sell better and are easier to manage.

Getting the Size Mix Right

The total matters less than the split across sizes.

A size curve is the share of each size you order. Most brands sell more of the middle sizes than the extremes, but every audience is different, and fits differ by style. A boxy tee and a slim tee will not sell the same sizes.

SignalWhat it tells you
Past sales by sizeYour real curve, if you have one
Preorders by sizeEarly demand, before production
Your fitOversized cuts shift buyers down a size, slim cuts shift them up
Your audienceWho follows you, and where they shop

After the first drop, record what sold out first and what was left. That is the start of your real size curve. See size curve planning.

Plan the Reorder Before You Need It

Know how long a reorder takes from your factory, including shipping. If a reorder takes many weeks, a fast sell-out means a long gap with nothing to sell. Decide in advance which styles you will reorder and at what stock level.

When the first run arrives, your warehouse makes it sellable. At OC3PL, labeled inbound is received and slotted within one business day, and every size and color has its own location. There are no order minimums, so a first collection is welcome, and storage is billed on the space you actually use. See how to prep apparel inventory for a 3PL and reorder points.

Common First-Run Mistakes

  • Ordering the same quantity of every size instead of following demand.
  • Launching too many colors of one style.
  • Spending everything on the first run and having nothing left for a reorder.
  • Ignoring the factory's lead time, so a sell-out turns into a long gap.
  • Skipping bags and labels at the factory, which slows receiving at the warehouse.
  • Not recording what sold out first, so the second order repeats the first one's mistakes.

None of these are fatal. Every brand learns its real demand by selling. The point is to make the first run small enough to learn from and large enough to meet the demand you can already see.

What to record after the first drop

Write down how fast each style and size sold, what was left over, and what customers returned and why. That one page is the most valuable planning document a new brand has. It turns the second production order from a guess into an estimate.

Common Questions

Enough to meet the demand you can see from preorders, your list and past sales, within factory minimums, while keeping cash for a reorder. Many first-time brands order smaller and plan to restock.

The smallest quantity a factory will produce, usually set per style or per color.

The share of each size in your order. It should follow what your customers actually buy.

Usually a few styles with a full size run. Many styles with few units each are harder to sell through and manage.

Yes. Preorders show demand by style and size before you place the production order.

No. There are no order minimums, and storage is based on the space your inventory uses.

Not always. If one color is a test, order a smaller size run in it. Put depth into the colors and sizes you are confident will sell.

That is a good problem. Have a reorder plan ready, tell customers when the restock is coming, and consider taking preorders for the next run.

Related Reading

More detail, in OC3PL’s own guides.

Tell Us About Your Catalog

Send us your monthly order volume, SKU count and where you sell. You will get a line-item quote, and a person on site you can call.

Schedule A Call
Close

Schedule A Call